Molding the Concrete
A little "mold release" is applied to the concrete mold. The cement is mixed by
following the directions and then poured into one half of the mold. Before
filling all the way, the cement should be shaken a little so that every crevice
in the mold is filled and the cement is settled. Fill the concrete mold rest of
the way and shake again to get a flat, even top. Set aside to dry for at least
24 hours (longer if it’s in a humid environment). When the concrete is dry, turn
your concrete mold over and lightly tap on the bottom to pop the concrete stone
out.
|