Site Pages
Home
About Concrete blocks
About Us & TOS
Concrete Landscaping
Concrete Patios
Molding Concrete
Types Concrete Mixers
Video - Mix Concrete No Tools
Store Pages
More Shopping Guides

Molding the concrete

Molding the Concrete

A little "mold release" is applied to the concrete mold. The cement is mixed by following the directions and then poured into one half of the mold. Before filling all the way, the cement should be shaken a little so that every crevice in the mold is filled and the cement is settled. Fill the concrete mold rest of the way and shake again to get a flat, even top. Set aside to dry for at least 24 hours (longer if it’s in a humid environment). When the concrete is dry, turn your concrete mold over and lightly tap on the bottom to pop the concrete stone out.